Downsizing Sage MMS
I have a client who is looking at moving from a very old Sage MMS(v1) system to Sage 50 as part of a stream lining project, has anyone performed one these upgrade?
I am used to moving from a small system to a large system but not the other way round. Any tips of wisdom would be greatly appreciated!


Not simple,,,